Technological tasks

The Tech-tasks module is tasks related to the development, implementation and improvement of new technologies, products and processes. If you have development, implementation and other needs you can post information below.

Filter
859 tasks

Hydraulic calculation of oil and gas collection system

The system for collecting and transporting oil and gas in the field at the current production capacity requires recalculation of the hydraulic parameters of the system. There is a discrepancy between the initial design data of the oil and gas collection system and the actual performance of the system. As a result, the collection system installations operate inefficiently and energy resources are wasted. It is necessary to recalculate the system in terms of pressure, throughput, diameters, pressure losses

Customer

ЦНТИ "Самгау"

Decision acceptance deadline

25.06.24 (inclusive)

Preferred systems

Intelligent control systems

Number of applications

0

Using waste-free gas purification technology

When purifying gas from hydrogen sulfide, the alkaline cleaning method is used. At the same time, there are large costs for servicing expensive equipment designed for alkaline cleaning, costs for energy resources, chemical reagents and disposal of waste alkali. NaOH alkali is used, which requires the use of expensive equipment. The alkali requirement reached a maximum of 600 liters per hour

Customer

ЦНТИ "Самгау"

Decision acceptance deadline

25.06.24 (inclusive)

Preferred systems

Raw material processing technologies

Number of applications

0

Restoring the verticality of the Incinerator (afterburner)

The verticality of the afterburner is broken. In case of strong wind, deviation from the vertical axis is observed, as well as oscillations of the flare trunk in winter at low temperatures. The fluctuation is approximately from 60 cm to 1 meter.

Customer

ЦНТИ "Самгау"

Decision acceptance deadline

25.06.24 (inclusive)

Preferred systems

Industrial Safety

Number of applications

0

Control of mechanical impurities in the preparation and injection of water

To maintain reservoir pressure (PPD), water is pumped, initially industrial water from the intake wells of the Albsenomanian horizon. Due to the increased water availability of wells, the raw material separated from the oil is cleaned at the water treatment plant and pumped through the PPD system into the reservoir. When pumping mixed technical and raw water, precipitation of iron oxide occurs, which leads to a discrepancy in the quality of water for flooding with the requirements of ST RK 1662-2007: The existing technological scheme of water treatment at the installation cannot ensure the appropriate water quality according to the requirements of ST RK 1662-2007 (in terms of the content of mechanical impurities and petroleum products)

Customer

ЦНТИ "Самгау"

Decision acceptance deadline

24.06.24 (inclusive)

Preferred systems

Raw material processing technologies

Number of applications

0

Automate the calculation of commercial proposals for clients

Increase the speed of calculating commercial offers upon request from clients regarding railway transportation services. Make this business process more convenient for the internal user. Calculations are more accurate and transparent.

Customer

ТОО Atasu Logistics

Decision acceptance deadline

19.06.24 (inclusive)

Preferred systems

Neurotechnology and artificial Intelligence

Number of applications

2

ЗАО "ФИНКА Банк" Кыргызстан - мобильное и веб-приложение Банка для физ. и юр. лиц

CJSC FINCA Bank announces a tender to select a supplier to purchase services for individual development or purchase of a ready-made solution for remote banking (mobile and web applications of the bank), intended for use by both individuals and legal entities. The Bank strives to provide customers with modern and convenient technological solutions that allow them to conduct account transactions, manage finances and receive information about banking services through mobile and web platforms.

Customer

ЗАО "ФИНКА Банк"

Decision acceptance deadline

06.06.24 (inclusive)

Preferred systems

Other technological solutions

Number of applications

6

SupplBot - an integrated chatbot system for automating procurement processes

The project involves the creation of an integrated chatbot system to automate procurement processes and interaction with suppliers through large trading platforms and instant messengers, with an emphasis on the use NoCode solutions and maximum use of ready-made APIs and LLM (Language Learning Models) capabilities such as Open AI, Alibaba, Chatbot and WeChat.

Customer

Alamata Icn.

Decision acceptance deadline

24.05.24 (inclusive)

Preferred systems

Supply Chain

Number of applications

1

Development of an information system for KSU Center for Active Longevity in Astana

Development, maintenance and technical support of IT system - modules for process automation: - Module “Visitor and Employee Electronic Passport System”; - Module “Real-time video monitoring system”; - Module “System for electronic registration of visitors to events”; - Module “Automated system for recording and monitoring visitors through facial recognition technology.

Customer

КГУ Центр активного долголетия г. Астана

Decision acceptance deadline

14.05.24 (inclusive)

Preferred systems

Technologies in telecommunications

Number of applications

1

Development of e-document flow using EDS signatures of the NCA RK and QR via EGOV Mobile

It is necessary to develop and integrate electronic document management onto the existing platform of our marketplace for signing contracts, accounting documents, etc.

Customer

Inderdentica

Decision acceptance deadline

14.06.24 (inclusive)

Preferred systems

Internet of Things

Number of applications

1

Thermal insulation coating

To avoid pipe breaks

Customer

Ангренсор Энерго

Decision acceptance deadline

26.04.24 (inclusive)

Preferred systems

New production technologies

Number of applications

0

Task type

Preferred systems

Field of application

Reset filters