Price: 0
Number of applications: 0
30.04.24 (inclusive)
negotiable
Idea
R&D Tasks
Chemical and petrochemical industry
New production technologies
Purpose and description of task (project)
The well operates in a flowing manner and it is not advisable to stop it and cap it to repair the valve, because well then maybe will not return to its previous mode.
other
If to cap a well with liquid, loss of high fountain inflow is possible.
It is necessary to repair the valve without capping a flowing well with a current oil flow rate of 33 tons/day. Wellhead pressure Rtr-80atm., Rztr- 96atm.
Е. Mazbaev