Technological tasks
The Tech-tasks module is tasks related to the development, implementation and improvement of new technologies, products and processes. If you have development, implementation and other needs you can post information below.
fixing violations with AI at a construction site
Good afternoon! We are a construction company looking for a project (you can start a startup) to digitize and control construction in Astana. What do you need: Monitoring of construction stages; Monitoring comments during construction; Construction management by stage. For more information, please call: 8 706 842 95 95. 1
Decision acceptance deadline
17.03.25 (inclusive)
Preferred systems
Geological research methodsNumber of applications
1
Set up an auto-order at a pharmacy
Create an auto-order that would synchronize with the accounting programs
Decision acceptance deadline
17.03.25 (inclusive)
Preferred systems
Processing and storage of Big DataNumber of applications
2
Creating a recommendation system using AI
It is necessary to implement an AI module for an online store of purchase recommendations based on user activity and purchase history.
Decision acceptance deadline
17.03.25 (inclusive)
Preferred systems
Other technological solutionsNumber of applications
0
Video counter the ability to correctly count bags
Ensure that the bags that pass through the frame on video or in real time can be counted correctly. The special feature is that the bags can move in closed queues, while there can be more than 5 bags in one queue.
Decision acceptance deadline
17.03.25 (inclusive)
Preferred systems
Intelligent control systemsNumber of applications
0
Telegram bot for the FOX system
Create a bot to get the results of the analysis from the FOX. The research results are in our database in the "Sender" folder
Decision acceptance deadline
10.01.25 (inclusive)
Preferred systems
Information processing and transformationNumber of applications
3
Refinement of the labeling system for beer kegs in the beer bottling industry
Currently, there are five conveyor belts for the production of beer bottling in kegs of 30 and 50 liters at the enterprise of IP "Efes Kazakhstan" JSC. Filled beer kegs move automatically along each of these belts. All five conveyor belts converge into one common belt, along which all the filled kegs begin to move, and the process of weighing the filled kegs is carried out. Further, after the keg weighing process, using a makem-imaje 2200 TAM BLOW printer, the process of labeling paper tags on each keg takes place, on which the volume (liters), the date of beer bottling, and the weight of the filled keg are indicated. However, there are situations where the shared feed stops automatically. This happens if the common belt along which the beer kegs move detects unfilled kegs during weighing. As a result of the shutdown of the general tape, the production of beer bottling in kegs and five shipping tapes are also stopped. The shutdown of the entire production continues until the workers discover exactly where the beer was underused in the keg.
Decision acceptance deadline
10.01.25 (inclusive)
Preferred systems
Information processing and transformationNumber of applications
2
1C integration with a WIX-based website
integration of 1C with the website for the sale of goods in the future
Decision acceptance deadline
10.01.25 (inclusive)
Preferred systems
Labor protection, industrial safety, environmental protection and production operationsNumber of applications
1
Automation of accounting and control of devices
Development and implementation of an automated accounting and control system for the issuance, return and maintenance of security devices issued to employees and contractors. The aim of the project is to increase the level of industrial safety, optimize accounting and maintenance processes, as well as reduce the risks associated with the use of faulty equipment.
Decision acceptance deadline
10.01.25 (inclusive)
Preferred systems
Labor protection, industrial safety, environmental protection and production operationsNumber of applications
2
Mobile application development
Develop a mobile application for the Hotel. Details in the technical assignment
Decision acceptance deadline
10.01.25 (inclusive)
Preferred systems
Internet of ThingsNumber of applications
1
website development
website presentation
Decision acceptance deadline
10.01.25 (inclusive)
Preferred systems
Industrial designNumber of applications
2