Technological tasks
The Tech-tasks module is tasks related to the development, implementation and improvement of new technologies, products and processes. If you have development, implementation and other needs you can post information below.
Комплексный геодинамический мониторинг территории газового месторождения Шагырлы-Шомышты с использованием наземно-космических методов
To study and quantify the spatiotemporal dynamics of deformation processes in the development area of the Shagyrly-Shomishti gas field through the integration of GNSS, InSAR, and gravimetry time series with 3D geomechanical reconstruction of the current stress-strain state, linking the observed displacements with the geological structure and accelerated gas production.
Decision acceptance deadline
29.10.25 (inclusive)
Preferred systems
Positioning SystemsNumber of applications
2
Разработка и апробация интегрированного цифрового программного комплекса для анализа газовых потоков и обработки данных производственных процессов на месторождениях ТОО «Тасбулат Ойл Корпорэйшн» с учетом принципов (ESG)
Creation of a unified digital environment for collecting, storing and processing data on production processes related to production, transportation, processing and utilization of gas at the fields of Tasbulat Oil Corporation LLP to increase transparency, manageability, efficiency, as well as increase the value of data-driven decision making.
Decision acceptance deadline
04.11.25 (inclusive)
Preferred systems
Intelligent control systemsNumber of applications
3
The task of developing a DWG file viewer in 1C: ERP
The project is aimed at developing a solution for integrating the ability to view DWG files directly in the 1C interface (1C ERP, version 8.3.26.1581).
Decision acceptance deadline
22.10.25 (inclusive)
Preferred systems
Design toolsNumber of applications
0
Normalization of SKU names for medical products
To develop a system for normalizing the names of SKUs (medicines) to improve the accuracy and speed of searching through an internal database and external reference books, as well as for further training of the AI agent.
Decision acceptance deadline
21.10.25 (inclusive)
Preferred systems
Information processing and transformationNumber of applications
2
Integration of the logistics system with cartographic services
The goal is to develop a visualization functionality for railway routes and wagon flows on a map using cartographic services. Main tasks: 1. Display routes between departure and destination stations. 2. Visualization of the flow of movement of wagons on the map based on the array of dislocations of wagons and directions of movement. 3. Implementation of a dynamic display of the movement of wagons on a timeline (using the date slider). 4. Ensuring the display of attributes of the traffic flow: - the direction of movement, - the condition of the car (empty / loaded), - the number of wagons. 5. Provide for the possibility of expanding the functionality based on the requirements of logisticians (filtering, analytics).
Decision acceptance deadline
15.10.25 (inclusive)
Preferred systems
Technologies in transport and logisticsNumber of applications
12
Creating a job and employee search website
The main goals of creating a website • Creation of a single digital platform for employment • Simplification of interaction between employers and job seekers • Automation of the process of search, response, analysis and selection of candidates Target audience • Private applicants (students, specialists, workers) • Small, medium and large business companies • Recruitment agencies
Decision acceptance deadline
14.10.25 (inclusive)
Preferred systems
Processing and storage of Big DataNumber of applications
14
NVIDIA Jetson AI Challenge
The goal of the challenge is to find and support innovative solutions in the field of artificial intelligence (AI) using high–performance NVIDIA Jetson Xavier modules that provide edge computing and AI analytics in real time. Tasks: 1) develop applied AI/ML solutions for various industries, 2) create smart services for a real residential complex (security, comfort, housing and communal services, digital services).
Decision acceptance deadline
31.10.25 (inclusive)
Preferred systems
Intelligent control systemsNumber of applications
8
Website development for the GOLMA AGENCY marketing agency
GOLMA AGENCY is a full-service digital agency of a new format that combines 4 areas: SMM , Production , Perfomance Marketing , Branding. At the moment, it is necessary to develop a website that will convey our approach, mission and values. It is also necessary to integrate Meta, TikTok, Google pixels (Information will be provided)
Decision acceptance deadline
13.10.25 (inclusive)
Preferred systems
Other solutions for the creative industryNumber of applications
10
Automation of the orphan drug delivery and control process
Разработать и внедрить решение в 1С:Предприятие для автоматизации процессов учёта, выдачи и контроля орфанных препаратов. Система должна обеспечить: • проверку права пациента на получение орфанного препарата через интеграцию с Республиканской базой данных (РДБ); • прозрачность и контроль всех операций; • исключение ошибок и злоупотреблений при учёте
Decision acceptance deadline
08.10.25 (inclusive)
Preferred systems
Information processing and transformationNumber of applications
4
Configuring Atlassian JIRA
Migration project from Azure DevOps to Jira for a large company
Decision acceptance deadline
13.10.25 (inclusive)
Preferred systems
Processing and storage of Big DataNumber of applications
1